0.27uF 275V Polypropylene Safety Capacitor X2-MPX 274
NEW long leads Axial Polyester Film Capacitor 0.1uF 630V fr tube amp radio
MOQ :300 piece
Lead Time :10 Days
Seller Support : Trade Authenticity Guaranteed & Accepting
Payment : L/C,T/T,Credit Card,Western Union,Money Gram,Money Order,Pay Pal
Departure Port : Shenzhen
Product details
Supply Ability
- Supply Ability:900000 piecesWarranty(Year):2 Year
Packaging & Delivery
- Length:43 cmWidth:29 cm
- Height:33 cm
- Packaging:100 piece
Product Specifications
Product Description
Metalized Polypropylene Film Capacitor Axial Shape CBB20
Are non-inductively wound with metallized Polypropylene film as dielectric/electrode with copper-clad steel leas or flexible cord and outer wrapping of polyester end sealed with epoxy resin.
Features:
1. Non-inductive construction and self-healing property.
2. Good soldering ability.
3. Low dissipation factor and high insulation resistance.
4. High stability of capacitance and reliability.
Typical applications:
1. Temperature compensation circuits.
2. Timing, oscillator, snubbering circuits.
3. Power factor correction and coupling capacitor in SMPS applications.
4. Remote communication, data processing, industrial instruments, automatic control system of the equipment, welding machine, IGBT snubbering, frequency divider.
Specifications:
Reference Standards: | GB10190-88( IEC 60384-16) |
Rated Voltage(UR): | 100VDC;250VDC;400VDC;630VDC;1000VDC |
Climate Category | 40/085/21 |
Rated Temperature | 85°C |
Operation Temperature Range: | -40°C - +85°C |
Capacitance Range: | 0.010uf-33uf |
Capacitance Tolerance Range: | J(±5%);K(±10%);M(±20%) |
Dielectric: | Polypropylene Film |
Dissipation Factor: | ≤0.1% (1KHZ)(25°C±5°C) |
Insulation Resistance(Between Terminals) | 100VDC,1 Min 20°C CR≤0.33μF ≥30000MΩ CR>0.33μF ≥10000 MΩ |
Withstand Voltage: | 1.6UR(5S) |
Life. Test Conditions: | 85±2°C,1.25UR,1,000Hours Capacitance Drift: ≤±15% Of the initial value Dissipation Factor ≤200%(1KHz) |
You May Like
- Free Member
- Trade Assurance
Business Type : Manufacturer,Exporter,Wholesaler,Distributor
Company Location:
Year Established: 20YRS
You May Like
-
0.27uF 275V Polypropylene Safety Capacitor X2-MPX 274
-
1uF 400V metallized polypropylene film capacitor MPP
-
0.68uF 275V Polypropylene Safety Capacitor X2-MPX 684
-
0.047uF 275V Polypropylene Safety Capacitor X2-MPX 473
-
1.0uF 275V Polypropylene Safety Capacitor X2-MPX 105
-
SR 0.47uF 275Vac Class X2 Metallised Polyester Capacitors
-
2.0uF 275V Polypropylene Safety Capacitor X2-MPX 205
-
0.056uF 275V Polypropylene Safety Capacitor X2-MPX 563
-
0.56uF 275V Polypropylene Safety Capacitor X2-MPX 564
-
0.22uF 275VAC MPX X2 polypropylene film capacitor P15